Friday, August 12, 2011

Construction Update–Week 3

 

Future part of kitchen and mud-room walls are framed.

DSC06798 (600x800)

DSC06799 (600x800)

DSC06807 (800x600)

DSC06810 (800x600)

The steel beam is put in place to set floor trusses.

DSC06823 (800x600)

DSC06826 (800x600)

A steel beam is tucked under the garage door. Seth got to remove and re-install the door.

DSC06885 (800x600)

DSC06887 (800x600)DSC06889 (800x600)

The second floor on the back is framed up.

DSC06891 (800x600)

DSC06892 (800x600)