Future part of kitchen and mud-room walls are framed.
The steel beam is put in place to set floor trusses.
A steel beam is tucked under the garage door. Seth got to remove and re-install the door.
The second floor on the back is framed up.
posted by Seth @ 10:33 AM 0 Comments
Subscribe to Post Comments [Atom]
<< Home
View my complete profile
Subscribe toPosts [Atom]
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home